Your Trusted Partner for Technology Driven Energy Projects

Since 1995, IAG has successfully completed over 150 projects in 17 countries around the world.
IAG aligns an exceptionally talented PMC team—with an average of 33 years experience—with a powerful proprietary integrated management system, to deliver projects safely, on-time, on-budget and on-spec. IAG successfully executes projects ranging from small revamps up to billion-plus dollar grass-roots complexes (IAG's Brochure) SAFETY
Downstream Grassroots EPC
Consumers Coop Regina, Saskatchewan, Canada
FCC • Cat-Poly • GasCon/Main Frac. • Offsites • Syncrude Distill.
2011

IAG has been retained by Consumers’ Co-op Refineries Limited (CCRL) as program managers for the grassroots portion of the proposed expansion, which would increase the output of Saskatchewan’s only oil refinery by 30 percent.

The grassroots expansion will include a fluid catalytic cracking (FCC) complex to support additional light synthetic crude oil processing from Canada’s oil sands. This expansion will be CCRL’s second large expansion this decade, and would take it above 130,000 barrels per day of crude processing capacity when completed in 2012.

Units Included:
  • UOP – FCC Unit
  • Syn-Crude Prefractionation
  • Main Fractionator
  • Gas Concentration Unit
  • Cat-Poly Unit
  • Associated Offsites

Midstream Grassroots EPC
SandRidge Energy Fort Stockton, Texas
Gas Plant • Offsites
2011
The Century Plant is a joint venture between SandRidge Energy Inc. and Occidental Petroleum Corp. It will extract carbon dioxide from natural gas that SandRidge recovers in the West Texas Overthrust, which Oxy would then use in its enhanced oil recovery. The Century Plant is a $1.2 billion investment.

The plant will go online in two segments. The first segment is expected to be completed in mid-2010, with the second in the first quarter of 2011.

Reportedly, the plant will increase SandRidge’s capability of producing methane from high-CO2 gas by five times and expand Oxy’s production by a minimum of 50,000 barrels of oil per day within five years.

Train 1
  • UOP Selexol
  • Ortloff CO2 Fractionation, including Dehydrator
  • OSBL - including control room, warehouse, RIE building, in-plant MCC/Switchgear building, inst air compressors, water tank, cooling tower

Train 2
  • UOP Selexol
  • Ortloff CO2 Fractionation, including Dehydrator
  • OSBL – MCC/Switchgear building, inst air, cooling tower, RIE building

FILTER PROJECTS BY
TYPE SECTOR SCOPE
Downstream Revamp EPC
Conoco Inc. Denver, Colorado
FCC
1997

Downstream Revamp EP
Conoco Inc. None
FCC #5
1997

Downstream Midstream Grassroots Revamp Es
UDS McKee, Texas
Olefins Rec. • Olefins Recovery
1997

Downstream Midstream Grassroots Revamp Es
UDS Mt. Belview, Texas
Propylene Fract. • Propylene Fractionation
1997

Downstream Revamp EPC/Es
Conoco Inc. Ponca City, Oklahoma
FCC #4