SOUTH AMERICAN REFINER “I”
Project Scope
- Reactor with UOP VSS Riser Termination and Secondary Cyclones.
- Regenerated Catalyst Standpipe
- Regenerated Catalyst, Slide Valve, and Expansion Joint
- WYE and Distributor
- UOP Elevated OPTIMIX Distributors and Spool Piece
- Regenerated Plenum and Cyclones
- Spent Catalyst Standpipe
- Spent Catalyst Slide Valve
- Seismic/Structural and Stress Analysis/Design/Modifications
| Project completed in 15 months |
|