|
|
WESTERN U.S. REFINER “E”
Project Scope
- Grass Root Design
- New Cold Wall Design:
- MSCC Reactor / Cyclone
- MSCC Regenerator / Cyclones
- Catalyst Cooler
- Catalyst Standpipes
- Slide Valves / Expansion Joints
- Direct Fired Heater
- UOP MSCC Feed Distributors
- Flue Gas-Cooler, Third Stage Separator, Orifice Chamber
- Reconditioned Main Air Blower / Turbine
- Reconditioned Catalyst Storage Hoppers
- Steam System With Associated Drums / Pumps
- New Concrete / Steel Support Structure
- Modifications to Associated Piping / Instrumentation / Control System
- Structural and Stress Analysis / Design / Modifications
| Project completed in 16 months |
|