|
|
GULF COAST REFINER “D”
Project Scope
- UOP Elevated OPTIMIX Distributors & Spool Piece
- Riser Standpipe and Cross Over
- Wye and Distributor
- Regenerated Catalyst Standpipe and Nozzle
- Regenerated Catalyst Slide Valve and Expansion Joint
- UOP Spent Catalyst Stripper and Standpipe
- Spent Catalyst Stripper Slide Valve and Exp. Joint
- Feed System Piping and Instrumentation
- Structural and Stress Analysis/Design/Modification
Project Results
- Smooth Flawless Startup
- Capacity Increase from 45,000 to 50,000 BPD
- Cat/Oil Increase by 15%
- Conversion Increase from 73% to 80%
- Conversion Increase from 65% to 74% (Heavy Feed)
| Project completed in 12 months |
|