EUROPEAN REFINER “B”
Project Scope
FCC Area
- Reactor with UOP VSS Riser Termination, Stripper & Cyclones (6)
- Regenerator Top Head and Cyclones (12)
- Regenerator / Combustor Shell Modifications
- Regenerated Catalyst Standpipe, Reactor External Riser, Slide Valve, Expansion Joint, Wye and Distributor
- Spent Catalyst Standpipe, Slide Valve, Expansion Joint
- UOP Elevated OPTIMIX Distributors and Spool Piece
- Recirculation Catalyst Standpipe, Slide Valve, Expansion Joint
- Modifications to Associated Piping / Structure / Instrumentation
- Structural and Stress Analysis / Design / Modifications
Other Work
- Turnaround Maintenance for FCC/Flue Gas System
- Main Fractionator Modifications
| Project completed in 16 months |
|